[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[Web Creator] [LMSOFT]
Parquetry
Available in:
VIC ASH, SPOTTED GUM, BLACKBUTT, OAK TIMBER, JARRAH, BRUSHBOX, AUSTRALIAN CHESTNUT
Installation
Engineered Floors
Timber Joist & Bearer Sub-Floors
  • Glued and secret nailed on to structural ply or chipboard over joists & bearers.
  • Glued and secret nailed on to acoustic mat over structural ply or chipboard over joists.
  • Installed above floating foam matt, gluing tongue & grooves using acoustic PVA glue onto structural ply or chipboard Concrete Sub-Floors.
  • Moisture Barrier membrane followed by fixed ply sheeting (9mm, 12mm & 19mm dependant on height restrictions) & secret nailed.
  • Glued and weighted on to approved acoustic matting.
  • Directly glued and weighted to a membrane slab where sub-floor heating is being used.
  • Installed above floating foam matt, gluing tongue & grooves using acoustic PVA glue.

Stairs
  • Over formed staircases we glue down engineered floor on both tread & riser.  We use pre-finished, matched solid stair nosing and 189mm boards for treads and risers. We also use a matched pre-finished cover strip to hide the engineered profile if installing using a floating stair with no stringers.

Walls
Our engineered flooring can also be used on wall application. 
We Glue and secret nail or just secret nail on to ply-lined walls. We also use a pre-finished & matched moulding for corners.

Solid Timber
Timber Joist & Bearer Sub-Floors:
  • Glued and secret nailed direct over joists & bearers.
  • Glued and secret nailed on to structural ply or chipboard over joists & bearers.
Concrete Sub-Floors:
  • Moisture Barrier membrane followed by fixed ply sheeting (9mm, 12mm & 19mm dependant on height restrictions) & secret nailed.
Directly glued and weighted onto concrete slab using Moisture Barrier membrane & full trowel gluing.

Parquetry
Concrete Sub Floor
  • Moisture Barrier membrane followed by full trowel gluing of parquetry blocks.
  • Full flood filling of putty over parquetry to ensure small gaps & imperfections are filled.
  • Coating applied.

Timber Joist Sub-Floors
  • Structural Ply or Chipboard sheeting no less than 19mm fixed onto joists & bearers.
  • Full trowel gluing of parquetry blocks.
  • Full flood filling of putty over parquetry to ensure small gaps & imperfections are filled.
Coating applied.

Levelling
Levelling is a very important part of any flooring installation project.  Every subfloor is assessed by our highly trained installation team & must adhere to a strict standard of :
“Not exceeding a height difference of 3-4mm over 2m.”
We have all the latest concrete grinding & sanding machinery to ensure rectification should the need arise.
  
Made to Order
Solid Timber:
Local and Imported Timber
Parquetry
Engineered Flooring:
Timber and Laminate
AMINI RUG COMPANY
Timber