Parquetry
Available in:
VIC ASH, SPOTTED GUM, BLACKBUTT, OAK TIMBER, JARRAH, BRUSHBOX, AUSTRALIAN CHESTNUT
Installation
Engineered Floors
Timber Joist & Bearer Sub-Floors
- Glued and secret nailed on to structural ply or chipboard over joists & bearers.
- Glued and secret nailed on to acoustic mat over structural ply or chipboard over joists.
- Installed above floating foam matt, gluing tongue & grooves using acoustic PVA glue onto structural ply or chipboard Concrete Sub-Floors.
- Moisture Barrier membrane followed by fixed ply sheeting (9mm, 12mm & 19mm dependant on height restrictions) & secret nailed.
- Glued and weighted on to approved acoustic matting.
- Directly glued and weighted to a membrane slab where sub-floor heating is being used.
- Installed above floating foam matt, gluing tongue & grooves using acoustic PVA glue.
Stairs
- Over formed staircases we glue down engineered floor on both tread & riser. We use pre-finished, matched solid stair nosing and 189mm boards for treads and risers. We also use a matched pre-finished cover strip to hide the engineered profile if installing using a floating stair with no stringers.
Walls
Our engineered flooring can also be used on wall application.
We Glue and secret nail or just secret nail on to ply-lined walls. We also use a pre-finished & matched moulding for corners.
Solid Timber
Timber Joist & Bearer Sub-Floors:
- Glued and secret nailed direct over joists & bearers.
- Glued and secret nailed on to structural ply or chipboard over joists & bearers.
Concrete Sub-Floors:
- Moisture Barrier membrane followed by fixed ply sheeting (9mm, 12mm & 19mm dependant on height restrictions) & secret nailed.
Directly glued and weighted onto concrete slab using Moisture Barrier membrane & full trowel gluing.
Parquetry
Concrete Sub Floor
- Moisture Barrier membrane followed by full trowel gluing of parquetry blocks.
- Full flood filling of putty over parquetry to ensure small gaps & imperfections are filled.
- Coating applied.
Timber Joist Sub-Floors
- Structural Ply or Chipboard sheeting no less than 19mm fixed onto joists & bearers.
- Full trowel gluing of parquetry blocks.
- Full flood filling of putty over parquetry to ensure small gaps & imperfections are filled.
Coating applied.
Levelling
Levelling is a very important part of any flooring installation project. Every subfloor is assessed by our highly trained installation team & must adhere to a strict standard of :
“Not exceeding a height difference of 3-4mm over 2m.”
We have all the latest concrete grinding & sanding machinery to ensure rectification should the need arise.